Bray is the southern end of the patch and gets the same coastal exposure problems as Dún Laoghaire. Mechanical installations, plant rooms, heating, specialist pipework, maintenance and site management in Bray, delivered by one team.

Bray is coastal, and that shows up in the plant: exposed external pipework and equipment take a harder life from salt air, external plant needs specifying with that in mind, and a lot of the buildings are hospitality that fills up at weekends. In practice most of what we are asked for in Bray is hotel and leisure plant, with everything else on the list available alongside it.

Hot and cold water services, drainage, sanitary ware and above ground pipework for commercial and industrial buildings...
Read more
Complete mechanical packages for new build and fit out projects in Dublin and Leinster, from mobilisation and first...
Read more
Commercial heating installations, boiler plant, distribution pipework, zoning and controls for offices, schools...
Read more
New plant rooms and upgrades to existing plant, from boilers, pumps and plate heat exchangers through to...
Read more
Copper, carbon steel, stainless and press fit pipework, fabricated on site, installed, supported, insulated and...
Read more
PPM programmes tailored to the building and the plant in it, covering equipment, plant and water systems at sensible...
Read more
Reactive attendance on heating, water and mechanical plant across Dublin and Leinster, with the cause found before...
Read more
Pressure testing, flushing, chlorination, balancing and commissioning, carried out properly and handed over with the...
Read more
Experienced mechanical site management and project support for commercial and industrial projects, from mobilisation...
Read moreAcross Bray (Eircode routing key A98) it is mostly hotel and leisure plant, school and community building heating, seafront property services and light industrial units, along with the pipework, plant replacement, testing and commissioning that goes with all of it. Bray is coastal, and that shows up in the plant: exposed external pipework and equipment take a harder life from salt air, external plant needs specifying with that in mind, and a lot of the buildings are hospitality that fills up at weekends. Every job starts with a survey of the actual building rather than a price guessed from a description.
No. Bray is about 19 km from the Dublin base, well inside the daily patch, so travel is in the price and a survey visit is normally a few days away.
Yes. Bray is the southern end of the patch and gets the same coastal exposure problems as Dún Laoghaire. Give us a ring and we will tell you what we normally find in plant rooms around Bray seafront and what yours is likely to need before anything is priced.
It does, and the difference is external plant. In Bray anything outside takes a harder life from the salt air: external pipework, condensers, roof plant, supports and fixings all corrode faster than the same kit inland, so material and coating choices matter more than they would a few miles further in. Beyond that, a good share of the stock is hospitality and leisure, which fills up at weekends and in summer, so plant work is sequenced around the trading calendar rather than into the middle of it.
Yes, and it is the main reason clients call us rather than splitting a mechanical package across three contractors. Plant, distribution pipework, water services, testing, commissioning and the close out documentation are all handled by the same team in Bray, which also means there is one number to ring when something needs sorting rather than three people pointing at each other.
Bray is around 19 km from the Dublin base, so getting out to survey and price is quick. Actually starting depends on the diary and, more often, on the shutdown window the building can give us. We would rather give you a date we can hold than an optimistic one, so ring and we will tell you where the next honest slot is.